Construction Updates
The Village works on a variety of projects each year to ensure our infrastructure is well maintained. Learn about what's happening next by selecting below.
2024 Madison Drive Multi-Use Path Improvement (Irving Park Road to West of Emerald Drive)
Week of October 21
The topsoil and landscape restoration will be completed this week. The contractor will have all traffic signs posted along the path and will start working on the punch list this week.
Route 59 Bike Bridge Project
Month of October
This project involves the construction of a pedestrian and bike path from Madison Drive to a bike trail on the west side of Route 59. The current phase of work includes site installing foundation piles and concrete foundations for the elevated truss bridge. The actual Steel Bridge over Route 59 construction is not expected to begin until 2025. Foundation pile installations for the elevated concrete boardwalk started in August.
2024 Various Concrete Repairs
Week of October 21
The landscape contractor will continue to water all the sod that was placed last week on Holly Dr, Ridgewood Rd, and Bartlett Rd (north of Cambridge Ave). Concrete pouring will take place at additional miscellaneous locations around town the first week of November.
2024 Road Program
Week of September 30
The 2024 Road Program has been completed.
2024 Watermain Improvements
(Holly Drive: Parkside Circle to E Streamwood Boulevard)
(Ridgewood Road: Tanglewood Drive to Walnut Drive)
Week of May 13
Project is complete.
This 8-10' asphalt path will connect Irving Park Road to the 59 Bridge Project (currently being constructed, Completion in 2025). The path will also connect to the Hoosier Grove Park path system. This project will also feature sidewalk improvements at intersections.
The improvements on Madison Drive will be from Irving Park Road to Creekside Park. The new path will begin at the east side of Madison Drive and change sides of the street with a crossing at Prairie Point Lane. The improvements will end at the Creekside Park driveway entrance. The project is scheduled to last from August to November 2024.
This work mainly consists of asphalt surface removal, pavement patching as needed, utility structure adjustments, paving of two new layers of asphalt, and pavement striping. The list below are streets to be completed in 2024.
- Brunswick Court
- Buchanan Lane
- Diane Avenue
- Evans Court
- Fairview Lane
- Fillmore Lane
- Garfield Lane
- Hackberry Drive
- Holly Drive
- Iris Drive
- Janet Avenue
- Judy Lane
- Linda Lane
- Manor Drive
- Myrtle Lane
- Nippert Drive (Lacy Avenue to Krause Avenue)
- Patricia Parkway
- Pepperidege Circle
- Ramblewood Drive (Frances Drive to Barrington Road)
- Ridge Circle (Streamwood Boulevard to Sunset Circle)
- Seton Court
- Seton Place
This work will mainly consist of installing new watermain on Holly Drive and Ridgewood Road. As part of this project, fire hydrants will be replaced and existing water services will be connected to the new watermain. This project will be followed by project from other contractors for concrete repairs (including all curb), asphalt patching, and asphalt resurfacing.
This work will take place on Holly Drive from Parkside Circle to E Streamwood Blvd, and Ridgewood Road, from Tanglewood Drive to Walnut Drive.
Work at the intersection of Irving Park and Bartlett Roads is substantially complete.
This Illinois Department of Transportation (IDOT) project will continue this spring. Work will include landscaping, pavement installation, markings, lighting, and signage. All renovation work is anticipated to be completed by the summer.
W Green Meadows Blvd and Eliasek Court
This project involves the rehabilitation of the sanitary lift station at Green Meadows Park. The contractor is Marc Kresmery Construction.
Improvements include new/rehabilitated valves, pumps, valve vaults, and electrical upgrades.
This project will be ongoing throughout the summer intermittently and expected to conclude in the fall, as construction materials become available. Traffic impacts are expected to be minimal.
The Village has been working since 2019 on the implementation of a bicycle and pedestrian bridge over Route 59 to improve connectivity in our community. This spring, work will start on the project. Work includes boardwalks through the wetlands, connecting with a steel truss bridge over Route 59. The boardwalks will tie into the existing path system on the west side of Route 59. The Village will also be working to install a path along Madison Drive to connect with the boardwalks, park and path system along Irving Park Road.
The initial work will include site prep, utility work and installing foundations for the boardwalk. Due to the steel material lead time, the prefabricated steel bridge portion of the project over Route 59 is anticipated to start in April of 2025 and be completed in July of 2025.
This new multi-use path is a key part of Streamwood’s long term Comprehensive Plan goal to increase connectivity and safe transportation options by establishing additional paths in the Village. The project is a joint effort with support from multiple agencies including the Village of Streamwood and funding from the Federal government, the Illinois Department of Transportation and Cook County. For more information regarding the project, click here.
Schaumburg Road resurfacing is substantially complete. Sidewalk and curb repairs, and pavement striping will continue with restoration in the spring. This is a Cook County Department of Transportation and Highway project.
This work will mainly consist of removing and replacing various concrete items within the Village’s right-of-way in preparation for resurfacing the street later in the year. Additionally, as part of this project, miscellaneous concrete repairs will be made throughout town, but those streets will not be resurfaced this year. The current list of streets due for resurfacing may be found above (under 2024 Road Resurfacing Program) but is subject to change throughout the year. Concrete repairs which may be performed include curb replacement, sidewalk replacement for ADA compliance, and adjustments to utility structures as needed. This work also includes restoration of disturbed areas.
The project begins on the week of March 25 and will be completed in August.
The work will be completed alphabetically in Section A, B, and then C. Residents will receive a notice from DiNatale Construction 24- to 48-hours before construction is set to begin on their street.
Section A
- Hackberry Dr (from Westgate Ter to East Ave)
- Holly Dr (from Streamwood Blvd to Parkside Cir)
- Iris Dr (from Streamwood Blvd to East Ave)
- Judy Ln (from Jill Ln to Green Meadows Blvd)
- Pepperidge Cir (from Westgate Ter to East Ave)
- Ramblewood Dr (from Frances Dr to Barrington Dr)
- Seton Ct (from Seton Pl to West End)
- Seton Pl (from Sunset Cir to East Ave)
Section B
- Buchanan Ln (from Garfield Ln to Jefferson Ln)
- Diane Dr (from Myrtle Ln to Linda Ln)
- Fillmore Ln (from Jefferson Ln to Jackson Ln)
- Garfield Ln (from Jefferson Ln to Washington Ave)
- Janet Ave (from Myrtle Ln to Linda Ln)
- Linda Ln (from Streamwood Blvd to Patricia Pkwy)
- Myrtle Ln (from Streamwood Blvd to South End)
- Patricia Pkwy (from Tanglewood Dr to Walnut Dr)
- Ridgewood Rd (from Tanglewood Dr to Walnut Dr)
Section C
- Brunswick Ct (from Park Blvd to East End)
- Evans Ct (from Park Blvd to East End)
- Fairview Ln (Edgewood Dr to Edgewood Dr)
- Manor Dr (from Park Blvd to Stratford Cir)
- Nippert Dr (from Krause Ave to Lacy Ave)
- Ridge Cir (from Sunset Cir to Streamwood Blvd)
This work is substantially complete. Some pavement/concrete/turf restoration of disturbed areas will continue in the spring.
Other agencies (such as Cook County or IDOT) are responsible for additional programs that impact our roadways. Click below to learn more: